Concrete · 2025

Green Island driveway + walk

Removed a cracked 1970s slab, regraded and compacted the base, poured 4 in fibermesh with control joints on a 10 ft grid, and formed a curved walk to the porch.

Area
1,900 sf
Thickness
4 in
Duration
6 days
Investment
$16,450