BROOM-FINISH DRIVEWAY, CURB APPEAL — GALLERY OF 6–10 IMAGES
Concrete · 2025
Green Island driveway + walk
Removed a cracked 1970s slab, regraded and compacted the base, poured 4 in fibermesh with control joints on a 10 ft grid, and formed a curved walk to the porch.
- Area
- 1,900 sf
- Thickness
- 4 in
- Duration
- 6 days
- Investment
- $16,450