OPEN KITCHEN AFTER, BEAM VISIBLE — GALLERY OF 6–10 IMAGES
Remodels · 2025
Beallwood kitchen + wall removal
Engineer-stamped triple LVL carrying the second floor, new footings under both posts, then full reframe for the island run and a widened cased opening to the dining room.
- Beam
- 3-ply LVL
- Span
- 18 ft
- Duration
- 5 weeks
- Investment
- $74,800