OPEN KITCHEN AFTER, BEAM VISIBLE Remodels
Load-bearing wall out, LVL beam in, full kitchen reframe.
18 ft LVL span5 weeks
Bump-outs, room additions, kitchen and bath gut jobs, and opening up walls between rooms.
Removing a load-bearing wall is the request we get most often and the one worth being careful about. Those jobs get an engineer-stamped beam specification and new footings under the posts carrying the load — not a guess and a header.
Remodels are disruptive by nature, so we work to keep them contained: dust barriers, a clean site every evening, and a schedule that tells you which weeks you will be without a kitchen.
Load-bearing wall out, LVL beam in, full kitchen reframe.